NBU:
7.99
10.51
2.64
Plants
As it is evident from practice the technologies of skeleton type construction of fast erected buildings and precast construction are most effective when constructing plants, factories and workshops. Significant advantages in strength, economy and short terms of construction are proved by successful experience of constructing similar objects. As compared with brick facilities the technology of skeleton type and precast construction allows saving on energy supply and heating tenfold, which is very profitable for further maintenance of industrial enterprises. The possibility of extending workshops, erecting additional spaces is achieved by moving wall panels inside the plant because the paneled skeleton serves as the bearing construction.
Among other advantages is a short term of constructing the building because skeleton type construction does not assume deep foundation due to its light structure.
Modular technology is most often used for buildings and workshops which are planned to be moved or extended in future. This is achieved at the cost of lightness and strength of the construction and also due to the absence of foundation, which allows transporting the structure without damaging. Line networks and heat insulation are chosen by the customer and installed at the plant in the process of manufacturing precast parts of the future building.
Construction of plants, factories, workshops and other similar buildings is one of the most developed directions of the MEGALINE Concern. The experience of constructing similar projects, the use of most advanced technologies, quality materials and effective system of construction stages management allow building and completing objects within the established terms. This is confirmed by recommendations of customers.
We can also mark advantages in the improved technologies of designing and experience in mounting mobile equipment (depending on the specifics of the building).
The availability of own structure steel plant allows significant minimizing of expenses, carrying out uninterrupted building and completing objects in good time.
Ovidiopol brick plant
In the MEGALINE Portfolio you can find Ovidiopol brick plant firmly occupying the leading position in its segment. One of the most important conditions of the construction was a short term of the object realization, which was successfully met by the MEGALINE Construction Concern.






